WESTERN TURNER SYNCLINE

MAJOR WATER INTRASTRUCTURE

Home   Projects Western Turner - UON

BACKGROUND

Western Turner Project is located approximately 36 KM from Tom Price mine site. UON were tasked to design, supply, install and commission bore pumps, generators, telemetry and associated equipment.

Pilbara

Region

0

Team members

Nearest Town

0

Pieces of equipment

RIO TINTO

Client

0

Hours worked

IRON ORE

Commodity

KEY SUCCESS

UON successfully delivered and commissioned 7 in-pit dewatering packages, turkey’s nest, sedimentation basins, pumping station, HDPE pipeline connections and additional dewatering resources to sustain operations at its open iron ore pit.



DELIVERABLES

  • HDPE pipe and fittings including associated civil works
  • 7 x In-pit bore pump assemblies and associated downhole equipment
  • 7 x Trailer mounted dewatering bore headworks and UON GMC Generators
  • Bore field telemetry system and integration into SCADA system
  • 5 ML turkey’s nest with sediment basin
  • 3 x Diesel driven skid mounted pumps for pumping station at turkey’s nest
  • 2 x Water stands

Other projects

Yandi Mine

30 MW Power Station and electrical distribution power at 33kV.

Kirkalocka Gold

Supply and Construction of Open Pit Dewatering of 5 Billion Litres

Nullagine

Supply and Installation of Power Station for Underground Mining

North Star Mine

16mw North Star Power Station 11Kv - Mine Supply Power Station

Jimblebar

Major Water Infrastructure

Ore Body 31

Major Dewatering Infrastructure Works