The Robe Valley is located approximately 140 km southwest of Karratha in the Pilbara Region of Western Australia. The town of Pannawonica is the nearest township and is located approximately 14 km northeast of the existing Mesa J Hub  and approximately 40 km east of the existing Mesa A Hub. UON were engaged as the head contractor for the design, supply and construction works as detailed below.

Pilbara

Region

0

Team members

Nearest Town

0

Pieces of equipment

Rio Tinto

Client

0

Hours worked

Iron Ore

Commodity

KEY SUCCESS

During these projects UON achieved several key successes, with the number 1 success joining forces with the local traditional landowners. UON have also been recognized for achieving 1 million-man hours LTI free.



WARRAMBOO DEWATERING

  • Clearing and grading, topsoil strip, pipe supply and delivery, earth pinning, thrust blocks, bore pad constructions, concrete and crossings
  • Wet plant haulage including 70,000 LCM pad material
  • Micro tunnelling and horizontal drilling
  • Supply and installation of transfer pump stations
  • 20 KM above & below ground HDPE pipeline, valves & manifolds

 

  • Steel pipeline, valves and manifolds
  • Free-issued MCC’s
  • Electrical substations and kiosk transformers
  • Overhead powerlines and pole top transformers
  • Electrical cables, optic fibre, conduits and terminations
  • Controls and communications

MESA A-J WATER SUPPLY

  • Clearing and grading, level corrections, topsoil strip, pipe supply and delivery, earth pinning, thrust blocks, bore pad construction, civils & earthworks, concrete, and crossings
  • Vacuum excavation, stabiliser sand, select fill, general fill and concrete
  • Wet plant haulage including 100,000 LCM borrow material
  • 14,000,000 litres of water cart usage
  • Installation of 44 KM above and below ground pipeline, valves and manifolds
  • Installation of steel pipeline, valves and manifolds

 

  • Micro tunnelling and horizontal drilling
  • Supply and installation of potable water infrastructure
  • Supply and installation of turkeys nest water supply infrastructure
  • Supply and installation of transfer pump stations
  • Installation of free-issued MCC’s
  • Supply and installation of electrical cables, optic fibre, conduits and terminations
  • Supply and installation of controls and communications

MESA J SOUTHERN CUT BACK

  • Clearing and grading, topsoil strip, pipe supply and delivery, earth pinning, civil & earthworks, bore pad construction and
  • Installation of above and below ground HDPE Pipeline, valves, fittings bends, reducers support and connections
  • Horizontal drilling
  • Supply and installation of electrical cables, optic fibre, conduits and terminations
  • Supply and installation of controls & communications

MESA BC WATER SUPPLY 

  • Clearing and grading, level corrections, topsoil strip, pipe supply & delivery, crossings, earth pinning and DMR Road and RTIO HDD shots
  • Installation of HDPE pipeline connecting bore headworks to Warramboo transfer tanks
  • Supply and installation of transfer water storage tanks
  • Installation of interconnecting HDPE pipe work between the Warramboo transfer pumps and water storage tanks
  • Supply and installation of electrical cables, optic fibre, conduits and terminations
  • Supply and installation of controls & communications

Other projects

Yandi Mine

30MW Power Station and electrical distribution power at 33kV.

Kirkalocka Gold

Supply and Construction of Open Pit Dewatering of 5 Billion Litres

Nullagine

Supply and Installation of Power Station for Underground Mining

North Star Mine

16mw North Star Power Station 11Kv - Mine Supply Power Station

Western Turner Project

Design Construct Major Dewatering Infrastructure

Ore Body 31

Major Dewatering Infrastructure Works