BACKGROUND

The client required the ability to vary the flow of the water due to the complexities of disposal capacity. The variable speed ability of the generators granted the client flexibility to manage their water demand to suit the environmental conditions.

Mid West

Region

0

Team members

Nearest Town

0

Pieces of equipment

Adaman

Client

0

Hours worked

Gold

Commodity

0 KVA

Scale of project

KEY SUCCESS

UON was contracted to design, manufacture and install a pontoon system to dewater over 5 Billion litres from an old open pit mine. The key success of the Pit Dewatering Works was the use of UON’s patent-pending GMC unit for total pumping control where pit access and logistics is challenging.



DELIVERABLES

UON deployed electric Grundfos pumps powered by our GMC generators to deliver over 30% fuel savings compared to competitors.

  • 3 x 300kVA GMC Generators
  • 3 x 147kW Grundfos Pumps
  • 3 x UON Modular Pontoon Systems

Other projects

Yandi Mine

30MW Power Station and electrical distribution power at 33kV.

Jimblebar

Major Water Infrastructure

Nullagine

Supply and Installation of Power Station for Underground Mining

Robe Valley

Major Water Infrastructure

Western Turner Project

Design Construct Major Dewatering Infrastructure

Ore Body 31

Major Dewatering Infrastructure Works

GET A PROMPT RESPONSE