Rio Tinto Iron Ore Case Study 2

MAJOR WATER INFRASTRUCTURE

Home   Projects Rio Tinto Iron Ore Case Study 2 - UON

BACKGROUND

UON were tasked by Rio Tinto to design, supply, install and commission bore pumps, generators, telemetry and associated equipment.

0

Team members

Pilbara

Region

0

Pieces of equipment

Rio Tinto

Client

0

Hours worked LTI-free

Iron Ore

Commodity

 

 

Purchase

Contract

KEY SUCCESS

UON successfully delivered and commissioned 7 in-pit dewatering packages, turkey’s nest, sedimentation basins, pumping station, HDPE pipeline connections and additional dewatering resources to sustain operations at its open iron ore pit.



DELIVERABLES

  • HDPE pipe and fittings including associated civil works
  • 7 x In-pit bore pump assemblies and associated downhole equipment
  • 7 x Trailer mounted dewatering bore headworks and UON GMC Generators
  • Bore field telemetry system and integration into SCADA system
  • 5 ML turkey’s nest with sediment basin
  • 3 x Diesel driven skid mounted pumps for pumping station at turkey’s nest
  • 2 x Water stands
  • Discharge pipe, and road pipework modifications

Other Projects

BHP Iron Ore Case Study 1

Major Water Infrastructure

Adaman Gold Case Study 1

Supply and Construction of Open Pit Dewatering of 7 Billion Litres

Novo Gold Case Study 1

Supply and Installation of Power Station for Underground Mining

Rio Tinto Iron Ore Case Study 1

Water Management Infrastructure

BHP Iron Ore Case Study 2

Water Management Infrastructure

BHP Iron Ore Case Study 3

30MW Power Station and electrical distribution power at 33kV.