Novo Gold Case Study 1

Power Supply And Dewatering

Home   Projects Novo Gold Case Study 1 - UON

BACKGROUND

UON was contracted to supply “whole of mine” power and dewatering services for Nova Resources. This included managing a bore field that spanned over 100km with integrated pipework and a network of open pits that required dewatering as well. The operation required a dynamic approach. UON deployed permanent back-to-back technicians onsite to provide continuous operations and ensure that the mine site had continuous flow of water and delivery of power.

0

Team members

Pilbara

Region

0

Items of equipment

Novo Resources

Client

0

Hours worked LTI-free

Gold

Commodity

 

 

BOOM

Contract

DELIVERABLES

  • 40+ generators ranging from 8 kVA to 500 kVA.
  • Multiple submersible bore pump pontoon’s utilizing GMC Technology
  • Multiple diesel pump skids/trailers for mobile dewatering.
  • Telemetry over vast distances.
  • B.O.O.M 2.5 MW power station for underground mining operation.
  • 24/7 onsite technical support.
  • Light truck and multiple light vehicles.

Other Projects

BHP Iron Ore Case Study 1

Major Water Infrastructure

Adaman Gold Case Study 1

Supply and Construction of Open Pit Dewatering of 7 Billion Litres

Rio Tinto Iron Ore Case Study 1

Water Management Infrastructure

Rio Tinto Iron Ore Case Study 2

Design Construct Major Dewatering Infrastructure

BHP Iron Ore Case Study 2

Water Management Infrastructure

BHP Iron Ore Case Study 3

30MW Power Station and electrical distribution power at 33kV.

Get A Prompt Response