UON was engaged by BHP to supply, install and commission major dewatering infrastructure and transfer system for the new mining area.

0

Team members

Pilbara

Region

0

Pieces of equipment

BHP

Client

0

Hours worked LTI-free

Iron Ore

Commodity

 

 

D+C

Contract

KEY SUCCESS

This extensive dewatering project has contributed greatly to the lower carbon footprint and commercial viability of this mine as a whole. The efficiency of the solution saved a considerable amount of fuel and allowed the accessing of the ore body in a timely manner.



DELIVERABLES

  • 6 dewatering bores and downhole infrastructure
  • 31km coextruded HDPE pipe including 25Km of DN710
  • 10ML turkey nest dam including HDPE liner, associated pipe work and fencing
  • Transfer pump station
  • Standpipe pump station
  • Flow monitoring station
  • Switch room and control room

Other Projects

BHP Iron Ore Case Study 1

Major Water Infrastructure

Adaman Gold Case Study 1

Supply and Construction of Open Pit Dewatering of 7 Billion Litres

Novo Gold Case Study 1

Supply and Installation of Power Station for Underground Mining

Rio Tinto Iron Ore Case Study 1

Water Management Infrastructure

Rio Tinto Iron Ore Case Study 2

Design Construct Major Dewatering Infrastructure

BHP Iron Ore Case Study 3

30MW Power Station and electrical distribution power at 33kV.