BHP Iron Ore Case Study 1

Water Management Infrastructure

Home   Projects BHP Iron Ore Case Study 1 | UON, Perth

BACKGROUND

UON was engaged as the head contractor to Design, Supply, Install and Commission thirteen downhole bore packages, Generator & Headworks Trailers, Fuel Tanks and associated equipment including UON’s (Patent Pending) PROPOWER™ GMC Generator Technology. Construction works on this project were completed with RSK Contracting.

0

Team members

Pilbara

Region

0

Pieces of equipment

BHP

Client

0

Hours worked LTI-free

Iron Ore

Commodity

 

 

Purchase

Contract

KEY SUCCESS

UON minimised the loss of dewatering across the BHP sites during the removal of existing infrastructure and replacement with new infrastructure. This project required a high level of planning from our Projects and Production & Fabrication Facilities. UON achieved this safely and on time with zero recordable incidents for the duration of the project.



DELIVERABLES

  • 11 x 300kvA GMC Generator on Trailer
  • 4 x 200kvA UON GMC Generator on Trailer
  • 6 x 250kvA UON GMC Generator on Trailer
  • 3 x 150kvA UON GMC Generator on Trailer
  • 18 x 4000L UON Fuel Tanks
  • 16 x 92 to132kW Downhole Bore Pump Packages
  • 6km of HDPE
  • Steel Manifold Pipework and Valves
  • Hydro Testing, Installation & Commissioning
  • Delivered On-Time and In-Budget

Other Projects

Adaman Gold Case Study 1

Supply and Construction of Open Pit Dewatering of 7 Billion Litres

Novo Gold Case Study 1

Supply and Installation of Power Station for Underground Mining

Rio Tinto Iron Ore Case Study 1

Water Management Infrastructure

Rio Tinto Iron Ore Case Study 2

Design Construct Major Dewatering Infrastructure

BHP Iron Ore Case Study 2

Water Management Infrastructure

BHP Iron Ore Case Study 3

30MW Power Station and electrical distribution power at 33kV.

Get A Prompt Response