BACKGROUND

The client required the ability to vary the flow of the water due to the complexities of disposal capacity. The variable speed ability of the generators granted the client flexibility to manage their water demand to suit the environmental conditions.

0

Hours worked LTI-free

Adaman

Client

0

Pieces of equipment

Mid West

Region

0

Billion litres of water

Gold

Commodity

0  

Months 

Rental

Contract

KEY SUCCESS

UON was contracted to design, manufacture and install a pontoon system to dewater over 7 Billion litres from an old open pit mine within 12 months. The key success of the Pit Dewatering Works was the use of UON’s patent-pending GMC unit for total pumping control where pit access and logistics is challenging.



DELIVERABLES

UON deployed electric pumps powered by our GMC generators to deliver over 30% fuel savings compared to competitors.

  • 3 x 300kVA GMC Generators
  • 3 x 147kW Pumps
  • 3 x UON Modular Pontoon Systems

Other Projects

BHP Iron Ore Case Study 1

Major Water Infrastructure

Novo Gold Case Study 1

Supply and Installation of Power Station for Underground Mining

Rio Tinto Iron Ore Case Study 1

Water Management Infrastructure

Rio Tinto Iron Ore Case Study 2

Design Construct Major Dewatering Infrastructure

BHP Iron Ore Case Study 2

Water Management Infrastructure

BHP Iron Ore Case Study 3

30MW Power Station and electrical distribution power at 33kV.

Get A Prompt Response