Power Station - 4.46MW Load Bank Facility

Duration

November 2018 – June 2019

Summary

UON was contracted as lead Design & Construct contractor to supply and install a 4.46MW Load Bank Facility at a Power Station.Months of management, planning, discussion, preparation, and resolving technical challenges culminated in final completion energizing the new installation with 33kV.

Background Information

The power station provides backup and emergency electricity to the town and surrounding areas connected to the network.

Key Success

The key success of the installation was the quick turnaround by the site team given the strict compliance regime from regulators. The project was also completed with no injuries or environmental harm.

Equipment:

  • 1x 6.8MVA 33kV/400V ONAN Transformer substation in a 20-foot container
  • 1x 4.8MW/6MVA 415V Load Bank in a 20-foot container
  • 1x Load Bank-substation control room housing control and protection relays in a data rack
  • All mains cabling and materials

For more information on this project please contact our team