Dewatering Upgrade Project

Duration

September 2017 – June 2018

Summary

Design, fabrication, installation, testing and commissioning of dewatering and water management infrastructure including PATENT PENDING GMC Generators on Trailers©

Background Information

UON’s client required the infrastructure upgrade after hydrogeological modelling identified a requirement for further dewatering bores to be installed to achieve dry mining conditions.

Key Success

The key success of this project is UON’s close working relationship with the client on site to ensure minimal disruption to site operations and mining activities during installation

Equipment:

  • 9 trailer mounted dewatering Bore Headworks with PATENT PENDING GMC Generators©
  • 9 Bore Pump assemblies and associated downhole equipment
  • High density polyethylene (HDPE) pipe and fittings including associated civil works
  • Borefield Telemetry system including JR900, PLC and integration into SCADA system
  • All installation, commissioning & handover