Bellevue

VENT SHAFT DEWATERING

Home   Projects Bellevue - UON

BACKGROUND

The Bellevue Gold Project is located approximately 30 km north of Leinster township and sits in a major gold and nickel producing district. The historic mine was closed and forgotten for over 20 years and has not benefited from modern exploration and advances in dewatering technology.

Pilbara

Region

0

Team members

Nearest Town

0

Pieces of equipment

Bellevue

Client

0

Hours worked

Gold / Nickel

Commodity

0 KVA

Scale of project

KEY SUCCESS

UON were tasked with delivering a dewatering solution for an old mine being reactivated, via an existing ventilation shaft. This required a custom shaft cap to be designed and fabricated to facilitate two 147 kW submersible pumps, installed to a depth of 290 m. Additional telemetry was provided to monitor multiple level sensing probes and to enable full remote access control.



DELIVERABLES

  • 2 bore pump assemblies and associated downhole equipment
  • 2 dewatering bore head works and (Patent-Pending) UON GMC© Generators
  • Telemetry system and integration into SCADA system
  • 600 kVA of power
  • Installed in 6 days

Other projects

Yandi Mine

30MW Power Station and electrical distribution power at 33kV.

Kirkalocka Gold

Supply and Construction of Open Pit Dewatering of 5 Billion Litres

Nullagine

Supply and Installation of Power Station for Underground Mining

North Star Mine

16mw North Star Power Station 11Kv - Mine Supply Power Station

Western Turner Project

Design Construct Major Dewatering Infrastructure

Ore Body 31

Major Dewatering Infrastructure Works

GET A PROMPT RESPONSE