Rio Tinto Pumps
The scope of this work in Hamersley consisted of UON having to supply and install water pump sets.
Project fact file:
- Booster Pumps (6 Grundfos CR90-6 Vertical Multi stage pumps units)
- Heavy duty base plate
- Fabricated Manifolds
- Fitting of Keystone F611 Wafer Isolation valves
- Supply of pressure tank
- Installation of a diesel-powered fire pump and stand pipe water pumps