Fast-Response Bore Pump Replacement

Project Name

Fast-Response Bore Pump Replacement

Project Value

Not disclosed

Location

Remote South-West, Western Australia

Duration

August 2016

Summary

Fast-response bore pump replacement using the purpose-built UON Safety Cage©

Background Information

The fast-tracked pump replacement project came at short-notice with mobilisation occurring only 24 hours after the client reported the fault. The 1750km round trip to the remote site included replacement pumps and spare parts, with three personnel ready to troubleshoot and repair the fault. The UON team utilized 246 metres of 6-inch Wellmaster rising main extracted safely with the bores back up and running 48 hours later.

Key Success

The key success of the bore pump replacement project was UON’s swift response in mobilising the team and equipment to site in the 24 hours after the fault was reported. Use of the UON Safety Cage© ensured the repairs were undertaken safely at all times, bringing the bores back on-line with minimal downtime.

Equipment:

  • The UON Safety Cage©
  • All-terrain Crane
  • 6-Inch Wellmaster Rising Main
  • Wellamster-certified UON technicians
  • SP60-20R Bore Pump Packages
  • Cabling/Glands
  • Specialty Tools
 