Hire Project: Brockman 4 - Temporary Power Station

The Brockman mine site needed to provide power supply to a camp site accommodating 400 people. As a result, Rio Tinto/Hamersley Ltd. hired UON to provide a power station on a 10 month hire agreement contract; this involved the design, construction, installation and maintenance (the complete solution) of an unmanned 1 MVA temporary power station.

Project Name

Brockman 4 Temporary Hire Power Station

Project Value

Not disclosed

Location

Brockman Mine Site (Near Tom Price, Pilbara Region, WA)

Duration

Jan 2014 - Oct 2014

Summary

UON provides power to Brockman mine site via a hire agreement.

Background Information

The Brockman mine site needed to provide power supply to a camp site accommodating 400 people. As a result, Rio Tinto/Hamersley Ltd. hired UON to provide a power station on a 10 month hire agreement contract; this involved the design, construction, installation and maintenance (the complete solution) of an unmanned 1 MVA temporary power station.

Key Success

A key success of Brockman mine site is in the ability to provide our client with the complete solution (design, construct, install and maintain). UON (a) designed the solution from consultation with Onyx (b) constructed the solution using integrated world class components which can be added or removed to meet the projects demands (c) managed implementation (d) provided the client with an internal SCADA monitoring system to efficiently maintain the site. By choosing UON to design, construct, install and maintain the temporary Bockman power station, Rio Tinto/Hamersley Ltd. made an investment in its future productivity.

Equipment

  • 4 x 250 kVA Generators
  • 1 x 27,000l fuel tanks
  • 4 x Distribution Boards
  • SCADA remote monitoring system
 