Lang Hancock Hope Downs is a $1.3 billion iron ore mine 75 km from Newman in northwest Western Australia. Our job was to supply power to the mines accommodation village which houses 600 workers.
As part of this project, UON had to upgrade the old HV switchyard and install a high current switchboard with Arcfault protection. Power generation can be controlled from outside the power room with a touch screen; and monitored and controlled through the mine sites SCADA system using UON-designed telemetry.